
Agios Theodoros Solar Parkwith Battery Storage
Utility-scale solar PV with integrated BESS • Merchant market exposure • Zero curtailment risk
Investor pack — indicative materials only; not an offer to sell securities.
Solar PV System
Battery Energy Storage
- • Curtailment elimination
- • Curtailment recovery at peak prices (~€183/MWh evening peak ref., ~€158/MWh DAM avg — see teaser / model)
- • Grid stabilization revenue potential
Financial Structure
Conservative assumptions with strong leveraged returns
Capital Expenditure
Financing Structure
Revenue & Returns
Investment Options
Flexible equity participation suitable for private investors, family offices, and strategic energy investors
25%
Equity Stake
50%
Equity Stake
75%
Equity Stake
Why This Project
Ready to Build
All permits secured. Construction can begin immediately upon closing.
Integrated BESS
4-hour battery storage captures 65% curtailed solar and discharges at ~€183/MWh evening peak (TSOC DAM sample). 3,025 MWh/yr discharged = €554k BESS revenue Y1.
Premium Technology
680W bifacial TopCon, fixed tilt 25° south, white albedo ground (bifacial gain +11%) — delivering 2,150 kWh/kWp specific yield.
Strong Returns
Leveraged equity IRR ~16-20% — based on real dispatch model (65% curtailment baseline, rising DAM prices upside). Full derivation in Excel Revenue_Model sheet.
Single Operator
Lighthief handles EPC, BESS integration, and long-term O&M - one experienced partner.
De-risked Investment
RTB status, BESS curtailment protection, and DSCR above 3.0x provides safety margin.
Delivery & Operations
Single experienced operator from construction to operations

Lighthief
Full-service solar developer & operator
EPC Contractor
Turnkey construction
BESS Integration
Energy Management System
Long-term O&M
Asset management
Interested in This Project?
Schedule a call to discuss investment options, review detailed financials, and understand the project timeline.
Reference: PARK-RTB-2026 | Agios Theodoros, Larnaca District, Cyprus