Solar & BESSListings & reference projects
Licensed development tickets (grid connection status per listing), operational acquisitions, and portfolio-scale opportunities — with indicative economics, teasers, and LOI where available.
Investment opportunities
Licensed projects, for sale, and market-level materials — grid terms stated on each card.

Agios Theodoros Solar Park with Battery Storage
2.64 MWp bifacial solar + 10.56 MWh BESS — permits in place; confirm grid connection terms in diligence. Merchant DAM exposure with integrated storage.
Highlights
“Licensed utility-scale project with integrated battery storage — verify grid connection terms before close.”
— Reference: PARK-RTB-2026
Investor pack — indicative only; not an offer. Review teasers and models with your advisers.

5.01 MWp Operational Solar — Single-Axis Tracking
Operational utility-scale park with tracking, PPA-style offtake, and BESS expansion upside. Indicative asking price on listing page.
Highlights
“Fully specified operational asset with transparent equipment and O&M structure.”
— Reference: PARK-REF-5001
Investor pack — indicative only; not an offer. Review teasers and models with your advisers.

Cyprus Solar Portfolio — 8 Parks, 9.81 MW
8-park portfolio totalling 9.81 MW: licensed tickets with grid terms mostly pending (see each listing), 2 late-stage, 1 mid-stage. Agrivoltaic and BESS-integrated assets. Portfolio or single-park acquisition.
Highlights
“A diversified small-cap portfolio — permits largely in place; grid connection terms vary by park (see individual listings).”
— Reference: RAGELIA-PORTFOLIO-2026
Investor pack — indicative only; not an offer. Review teasers and models with your advisers.

Agios Ioannis Malountas Solar Parks (10.4 MWp)
CERA production licences (extended to 31/12/2029)
Highlights
“CERA production licences (extended to 31/12/2029) · Town planning permits issued · Building permits issued · Environmental approval (Dept of Environment) · Land leases valid to 2051 · EAC preliminary grid terms issued · ⚠ TSO confirmed no area grid capacity (Jan 2023); area substation upgrade in progress by EAC/TSO (est. completion Q4 2026)”
— Reference: PARK-RTB-VAN-2026
Investor pack — indicative only; not an offer. Review teasers and models with your advisers.

Cyprus — BESS & Hybrid Investment Context
March 2026·CYPRUS-BESS-2026

Sia Solar Park with Battery Storage
Target COD Q3 2027 (subject to EAC grid connection finalisation)·PARK-RTB-SIA-2026
CERA generation licence issued (Apr 2025)

Solar Parks #2205 + #2206 — Combined Package (2.817 MW)
#2205: target energisation Q3 2026 · #2206: target COD Q4 2026 (upon grid offer)·PARK-RTB-RAG2206-2026
#2205 (0.5 MWp): Construction complete — grid connection terms pending

Solar Park #2302 with Battery Storage — 0.825 MWp
Target COD Q4 2026 / Q1 2027 (upon grid offer + EPC procurement)·PARK-RTB-RAG2302-2026

Solar Park #2110 with Battery Storage — 0.714 MWp
Target COD Q4 2026 / Q1 2027 (upon grid offer + EPC procurement)·PARK-RTB-RAG2110-2026

Solar Park #2105 with Battery Storage — 0.69 MWp
Target COD Q4 2026 / Q1 2027 (upon grid offer + EPC procurement)·PARK-RTB-RAG2105-2026

Agrivoltaic Solar Park #2402 with BESS — 0.95 MWp
RTB target Q4 2026·RAGELIA-2402-2026

Solar Park #2501 with BESS — 0.95 MWp
RTB target Q4 2026·RAGELIA-2501-2026

Agrivoltaic Solar Park #2502 with BESS — 2.765 MWp
RTB target Q1 2027·RAGELIA-2502-2026
Custom solar / BESS
1–15 MW • Your specifications
Greenfield or retrofit — we align capacity, storage, and offtake with your target returns.
Discuss requirementsLetter of intent
Non-binding expression of interest
Prefill from any listing with ?listing=slug on the LOI page.
Open LOI generatorOperational reference
Operational benchmarks with verified production — useful for sizing BESS and merchant investment cases.

Anarita Solar Park — 10 MW Operational
Energized & grid connected·PARK-ANARITA-10
From our journal
Financing, risk, and BESS guides for Cyprus solar investors.
Sizing storage alongside solar acquisitions and RTB deals.
Read articleStructures that work for Cyprus utility-scale projects.
Read articlePermits, grid, and O&M — what investors should verify.
Read articleStart your solar investment journey
Book a call or request a data room — we'll align the right listing and diligence pack.