Solar farm projects

Solar & BESSListings & reference projects

Licensed development tickets (grid connection status per listing), operational acquisitions, and portfolio-scale opportunities — with indicative economics, teasers, and LOI where available.

40.89
MWp in deal lane
€19.2M+
Indic. deal scale
~30%
Top levered IRR (RTB)
14
Live listings

Investment opportunities

Licensed projects, for sale, and market-level materials — grid terms stated on each card.

Agios Theodoros Solar Park with Battery Storage
Connection terms pending
Licensed project
2.64 MW
Agios Theodoros, Larnaca District

Agios Theodoros Solar Park with Battery Storage

Agios Theodoros, Larnaca District·Target Q4 2026·PARK-RTB-2026

2.64 MWp bifacial solar + 10.56 MWh BESS — permits in place; confirm grid connection terms in diligence. Merchant DAM exposure with integrated storage.

30%
Indicative ROI / IRR
€833,500
Annual revenue

Highlights

Integrated 10.56 MWh BESS — 4-hour duration
Bifacial TopCon — strong yield
Leveraged equity IRR ~16-20% range (indicative)
Single operator: Lighthief EPC + O&M

Licensed utility-scale project with integrated battery storage — verify grid connection terms before close.

Reference: PARK-RTB-2026

Investor pack — indicative only; not an offer. Review teasers and models with your advisers.

5.01 MWp Operational Solar — Single-Axis Tracking
For sale
For sale
5.01 MW
Cyprus (Galascope Limited)

5.01 MWp Operational Solar — Single-Axis Tracking

Cyprus (Galascope Limited)·Operational·PARK-REF-5001

Operational utility-scale park with tracking, PPA-style offtake, and BESS expansion upside. Indicative asking price on listing page.

€9,000,000
Indicative transaction value

Highlights

5.01 MWp DC / 4.62 MW AC — premium trackers
Multi-year operational track record
BESS scenarios on project page
Reference PARK-REF-5001

Fully specified operational asset with transparent equipment and O&M structure.

Reference: PARK-REF-5001

Investor pack — indicative only; not an offer. Review teasers and models with your advisers.

Cyprus Solar Portfolio — 8 Parks, 9.81 MW
For sale
For sale
9.813 MW
Cyprus (multiple locations)

Cyprus Solar Portfolio — 8 Parks, 9.81 MW

Cyprus (multiple locations)·Various (grid terms mostly pending)·RAGELIA-PORTFOLIO-2026

8-park portfolio totalling 9.81 MW: licensed tickets with grid terms mostly pending (see each listing), 2 late-stage, 1 mid-stage. Agrivoltaic and BESS-integrated assets. Portfolio or single-park acquisition.

Highlights

Licensed parks — connection terms pending except where stated on listing
Agrivoltaic + BESS parks in pipeline
Individual listings for each park
Staged pipeline: immediate & Q3/Q4 2026 delivery

A diversified small-cap portfolio — permits largely in place; grid connection terms vary by park (see individual listings).

Reference: RAGELIA-PORTFOLIO-2026

Investor pack — indicative only; not an offer. Review teasers and models with your advisers.

Agios Ioannis Malountas Solar Parks (10.4 MWp)
Connection terms pending
Licensed project
10.4 MW
Agios Ioannis Malountas, Nicosia District, Cyprus

Agios Ioannis Malountas Solar Parks (10.4 MWp)

Agios Ioannis Malountas, Nicosia District, Cyprus·Target COD 2027/2028 — subject to EAC final grid connection terms (preliminary terms issued)·PARK-RTB-VAN-2026

CERA production licences (extended to 31/12/2029)

€2,151,380
Annual revenue

Highlights

10.4 MWp · 20 MWh BESS (4h)
Fully licensed (permits)
Area grid upgrade — connection terms pending
Indicative acquisition €400k (RTB ticket)

CERA production licences (extended to 31/12/2029) · Town planning permits issued · Building permits issued · Environmental approval (Dept of Environment) · Land leases valid to 2051 · EAC preliminary grid terms issued · ⚠ TSO confirmed no area grid capacity (Jan 2023); area substation upgrade in progress by EAC/TSO (est. completion Q4 2026)

Reference: PARK-RTB-VAN-2026

Investor pack — indicative only; not an offer. Review teasers and models with your advisers.

Cyprus — BESS & Hybrid Investment Context
Market overview
Market
Cyprus (portfolio / market)

Cyprus — BESS & Hybrid Investment Context

March 2026·CYPRUS-BESS-2026

Market-level investor teaser: policy, grid, merchant and BESS economics — not a single named RTB ticket.

ROI / IRR
Metrics
Use this note alongside individual project listings and your own diligence.
Sia Solar Park with Battery Storage
Connection terms issued
Licensed project
3.32 MW
Larnaca District, Cyprus

Sia Solar Park with Battery Storage

Target COD Q3 2027 (subject to EAC grid connection finalisation)·PARK-RTB-SIA-2026

CERA generation licence issued (Apr 2025)

ROI / IRR
€705,918
Annual revenue
CERA generation licence issued (Apr 2025) · Town planning permit issued (May 2025) · EIA approved · Land lease executed · EAC grid connection terms issued (ref 498000141 + Amendment 5, Jun 2025) · Substation sublease formalisation in progress
Solar Parks #2205 + #2206 — Combined Package (2.817 MW)
Connection terms pending
Licensed project
2.817 MW
Nicosia District, Cyprus

Solar Parks #2205 + #2206 — Combined Package (2.817 MW)

#2205: target energisation Q3 2026 · #2206: target COD Q4 2026 (upon grid offer)·PARK-RTB-RAG2206-2026

#2205 (0.5 MWp): Construction complete — grid connection terms pending

ROI / IRR
€610,155
Annual revenue
#2205 (0.5 MWp): Construction complete — grid connection terms pending · #2206 (2.317 MWp + BESS): Tier 1 licensed, permits in place · Land: FREEHOLD on both plots · Grid: formal EAC connection terms pending
Solar Park #2302 with Battery Storage — 0.825 MWp
Connection terms pending
Licensed project
0.825 MW
Nicosia District, Cyprus

Solar Park #2302 with Battery Storage — 0.825 MWp

Target COD Q4 2026 / Q1 2027 (upon grid offer + EPC procurement)·PARK-RTB-RAG2302-2026

Tier 1 licensed — permits in place

ROI / IRR
€190,124
Annual revenue
Tier 1 licensed — permits in place · Land lease registered, zero encumbrances · Grid: preliminary DSO filed; formal EAC connection terms pending (offer expected Q3 2026)
Solar Park #2110 with Battery Storage — 0.714 MWp
Connection terms pending
Licensed project
0.714 MW
Nicosia District, Cyprus

Solar Park #2110 with Battery Storage — 0.714 MWp

Target COD Q4 2026 / Q1 2027 (upon grid offer + EPC procurement)·PARK-RTB-RAG2110-2026

Tier 1 licensed — permits in place

ROI / IRR
€169,753
Annual revenue
Tier 1 licensed — permits in place · Land lease registered, zero encumbrances · Grid: preliminary DSO filed; formal EAC connection terms pending (offer expected Q3 2026)
Solar Park #2105 with Battery Storage — 0.69 MWp
Connection terms pending
Licensed project
0.69 MW
Nicosia District, Cyprus

Solar Park #2105 with Battery Storage — 0.69 MWp

Target COD Q4 2026 / Q1 2027 (upon grid offer + EPC procurement)·PARK-RTB-RAG2105-2026

Tier 1 licensed — permits in place

ROI / IRR
€163,816
Annual revenue
Tier 1 licensed — permits in place · Land lease registered, zero encumbrances · Grid: preliminary DSO filed; formal EAC connection terms pending (offer expected Q3 2026)
Agrivoltaic Solar Park #2402 with BESS — 0.95 MWp
Late stage
Late stage
0.95 MW
Nicosia District, Cyprus

Agrivoltaic Solar Park #2402 with BESS — 0.95 MWp

RTB target Q4 2026·RAGELIA-2402-2026

Tier 2 late-stage agrivoltaic asset with 0.95 MW / 1.9 MWh BESS in licence. Preliminary grid filed; RTB target Q4 2026. Data room on milestone.

ROI / IRR
€380,000
Indic. value
Tier 2 — Late stage (~70–85%). Investor pack available upon RTB milestone.
Solar Park #2501 with BESS — 0.95 MWp
Late stage
Late stage
0.95 MW
Nicosia District, Cyprus

Solar Park #2501 with BESS — 0.95 MWp

RTB target Q4 2026·RAGELIA-2501-2026

Tier 2 late-stage ground-mounted PV with 0.4 MW / 2.0 MWh BESS in licence. Preliminary grid filed; RTB target Q4 2026.

ROI / IRR
€380,000
Indic. value
Tier 2 — Late stage (~70–85%). Investor pack available upon RTB milestone.
Agrivoltaic Solar Park #2502 with BESS — 2.765 MWp
Late stage
Late stage
2.765 MW
Nicosia District, Cyprus

Agrivoltaic Solar Park #2502 with BESS — 2.765 MWp

RTB target Q1 2027·RAGELIA-2502-2026

Tier 3 mid-stage agrivoltaic development with 1.2 MW / 2.4 MWh BESS. Grid application not yet filed; RTB target Q1 2027.

ROI / IRR
€1,106,000
Indic. value
Tier 3 — Mid stage (~40–60%). Investor pack available upon RTB milestone.
Bespoke

Custom solar / BESS

1–15 MW • Your specifications

Greenfield or retrofit — we align capacity, storage, and offtake with your target returns.

Discuss requirements
Documentation

Letter of intent

Non-binding expression of interest

Prefill from any listing with ?listing=slug on the LOI page.

Open LOI generator

Operational reference

Operational benchmarks with verified production — useful for sizing BESS and merchant investment cases.

Anarita Solar Park — 10 MW Operational
Operational
10 MW
Anarita, Paphos District

Anarita Solar Park — 10 MW Operational

Energized & grid connected·PARK-ANARITA-10

Operational 10 MW asset with verified production — reference case for BESS retrofit and yield enhancement.

14.5%
ROI / IRR (indic.)
€1,950,000
Annual revenue
Transparent operational asset with verified performance and clear BESS investment path.
Insights

From our journal

Financing, risk, and BESS guides for Cyprus solar investors.

All articles

Sizing storage alongside solar acquisitions and RTB deals.

Read article

Structures that work for Cyprus utility-scale projects.

Read article

Permits, grid, and O&M — what investors should verify.

Read article

Start your solar investment journey

Book a call or request a data room — we'll align the right listing and diligence pack.